SD-I Routings Defaults

SD-I Routings Defaults

Field Explanations

Multiply or Divide by Num Processes [M,D]

This sets the default for the prompt of the same name within the #Proc window found in each of the three routings entry programs. See RO-A for a detailed explanation of how the number of processes can be divided into or multiplied by the processes/hour.

Use Standard Time [Y,N]

Sets the Std Time? default in routings entry. If set to yes, the system will apply standard time to any units reported through WO-F rather than require actual time to be entered.

Make Seq equal Template Number [Y,N]

If you copy in operation templates, setting this default to Y causes the program to assign the routing sequence the same number as the template, wherever possible. Use this if you want sequences and operations to have the same numbering.

Default Seq increment

When copying in multiple operation templates into routings, the program automatically assigns sequence numbers. This field sets the default increment. For example, if you like your routing sequences numbered 10, 20, 30, etc., enter a 10. If you want your numbering 1, 2, 3, etc., enter a 1.

Display Long Time Prompt

Normally time is entered in hours, minutes, and seconds. If you prefer entering decimal time, or if the number of hours per part is ever to exceed 99 hours, or you need greater precision for high production operations than 1 second per part can provide, you can have an optional decimal field display in a pop-up window that will allow entry of up to 9,999 hours and seven decimal places. Answer **Y **to this prompt if you want the Long Time field displayed during routings entry.

Sync Template Settings to RO-A (Y/N/A)

If this is enabled then changes to time standards in templates will update master routings. If set to A, you will be asked if the master routings should be changed.

Traveler Printing to print Routing Template Notes Type

If this is populated then notes can be maintained at the operation template for this note type and print on the traveler at WO-C allowing for things like quality instructions to be entered once rather than on every routing

Primary Routing Note Type

This defines the primary note type to be used at RO-A

ROA Enter Setup Time as Decimal

If this is set to Y the Setup Time will be entered as decimal hours rather than HH:MM:SS format

ROB Print Fixed and Variable Overhead as %

If this is set to Y the Overhead values will print as % of labor rather than dollar per hour amounts.

ROA/BMA Prevent Editing for Active Status

Enter the values of Active Status editing of BOM and Routing should be prevented for

ROA Recalc Parts/Hr when changing # Persons (Y/N/A)

If this is set to Y the recalculation is automatic. If A you will be prompted